Text Size: A+| A-| A   |   Text Only Site   |   Accessibility

Prefab Program

Applications and forms
Building Valuation Data/Phased Projects/Deferred Submittals
Custom Plan
Design Master Plan
Design Master Plan - Specific Use Structures
Prefab Inspection Calendar
Prefab Plan Review Submittal Checklist: Custom
Prefab Plan Review Submittal Checklist: Design Master Plan
"Effective April 1, 2007, BCD will adopt the 2006 IBC (2007 OSSC) 2006 IMC w/ Oregon amendments (2007 OMSC)
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
 

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe. Available for Macintosh or Windows.